Features
HZS75 concrete mixing plant is mainly composed of JS1500A concrete mixer, PLD2400 batching machine, cement silo and screw conveyor, conveyor belt, central control room. Mixing machine will use JS series double horizontal shaft forced mixer, is a forced, efficient equipment, can produce plastic, dry and hard concrete and other concrete, high production efficiency, short mixing time, and beautiful appearance, widely used in large and medium-sized building construction, roads and Bridges as well as the production of concrete products in the prefabrication plant, is the ideal equipment for the production of commercial concrete.
Working Rrinciple:
The aggregate is discharged into the aggregate metering bucket by the unloading door of the bone bin of the batching station for measurement. After the measurement is completed, the aggregate is unloaded onto the far-rotating flat belt, which is sent to the inclined belt machine, which is transported to the waiting hopper at the upper part of the mixer for instruction. Meanwhile, cement and fly ash are transported to their respective metering buckets by the screw conveyor for measurement. Water and admixtures are respectively sent to the respective metering bucket by the pump and admixture pump for measurement, after the measurement of various materials, the control system issued instructions to begin to feed into the mixer for mixing, after the completion of mixing, open the discharge door of the mixer, the concrete is unloaded into the mixing transport through the discharge hopper, and then enter the next working cycle.
Product Advantages:
1. The HZS75 concrete mixing plant requires a small site, and can save up to one-half to two-thirds of the land occupation area compared with the usual inclined belt conveying mixing plant.
2. Optional fixed in steel beam or fixed, steel beam concrete mixing plant on the main mixing system from the transport vehicle to the installation of only a few hours, together with the control room, batching station and other supporting equipment installation, HZS75 concrete mixing plant as long as two to four days to complete the preparation before production.
3. The equipment platform, measuring platform and lifting system platform of cement mixing station fully ensure the needs of calibration, inspection and maintenance equipment. There is still enough space for daily work when a protective layer is required.
4.HZS75 concrete mixing plant adopts the method of lifting hopper to load, and the unique design of hopper and track can conveniently and efficiently hold and dump aggregates, and greatly reduce the site occupation area
Technical Data:
project | Maximum productivity | Mixer model | Batcher model | Discharge height | Working cycle time | Weighing accuracy | |||
HZS75 | 75m3/h | JS1500A | PLD2400 | 4100(mm) | 72(S) | aggregate 2% | cement 1% | water 1% | Additives 1% |