Features
The new equipment has a run-in period at the beginning, so when the concrete mixing station is put into a new site, what matters need to be paid attention to?
After the installation of the new mixing plant equipment, it is necessary to add lubricating oil and butter. These jobs seem simple, but it is related to the service life of the entire mixing plant.
Moreover, after all the oil is added to the new machine, a small amount of material needs to be added to test the machine. In this process, every part should be carefully observed, there is no oil leakage, there is no abnormal sound and heat. If any situation occurs, please stop working immediately, solve the problem before continuing to work.
In addition, when increasing the input of aggregate, only the capacity of the mixing plant equipment can be reached, and it must not be overloaded, because sometimes even once, it can cause irreparable damage.
In this way, after a period of running-in, the concrete mixing plant equipment can be fully put into use. However, remember to replace the oil and grease within a fixed time, and often check whether there is any loosening and oil leakage in various parts, and solve the problem in time.